Timber & lumber
Long packs, outdoor yards and variable overhang dominate steer-mode choice.
Compare aisle geometry, load length, peak factor and temperature constraints across verticals. Combilift treats each profile as an engineering envelope—not a decorative icon row.
Use this table in RFQ packages so peak throughput claims include SKU mix, buffering and recovery assumptions.
| Requirement | Timber / metals | Manufacturing DC | Cold / multi-temp |
|---|---|---|---|
| Primary load unit | Long packs, bundles, pipes | Pallets + occasional long fixtures | Pallets / totes with condensation risk |
| Aisle & geometry | Narrow guide aisles, outdoor transitions | Shared WIP and outbound aisles | Door seals and restricted staging |
| Peak factor | Seasonal yard surges | Work-order release waves | Dispatch windows vs door-open time |
| Safety / traffic | Yard pedestrian routes, tip risk | AMR coexistence possible | Fogged optics and floor traction |
| Acceptance focus | Residual capacity at length | Interface owners & cutover | Battery / tire duty under temperature |
Industrial truck packages do not resolve every dispute in warehouse automation. The sections below state opposing positions so capital and operations teams can decide which risk they prefer to own.
Peak throughput view: Size the fleet to the highest order lines per hour window when SKU velocity is stable and buffer occupancy is predictable.
Resilient flow view: Keep spare trucks, aisle width margins and mean time to repair targets so a single hydraulic or battery event does not collapse the dispatch window.
Combilift RFQs ask for both the design peak and the recovery path. A peak claim without exception ownership is incomplete.
Greenfield view: Optimize aisle width, charger rooms and residual capacity placards in one layout pass before live waves begin.
Brownfield view: Stage cutover bay-by-bay, accept temporary mixed fleets with AGV/AMR coexistence rules, and prove SAT under constrained floor class and existing rack faces.
Neither path is universally correct. The wrong choice is publishing a brochure rate that ignores the live operating boundary.
Share load unit, peak rate, aisle constraints and interface owners so application engineering can respond with a reviewable scope.