Engineering accountability

About Combilift: teams that keep truck evidence visible after the handshake

We build a workplace where load-center notes, aisle constraints and service access are treated as shared craft—not as afterthoughts once steel rolls into the aisle. Application engineers, field leads and documentation specialists share the same scenario register so a fleet decision can be explained months after SAT.

Combilift engineering team reviewing truck application drawings
Responsibility matrix

Name the owner before a truck interface can fail silently

WMS tasking, traffic rules, charger rooms and safety devices need clear boundaries. Combilift keeps the matrix as a living project document, not a slide that disappears after kickoff.

InterfaceCombilift scopeSite / integrator scopeEvidence
Truck residual capacityPublish limits for stated load centers and attachmentsConfirm actual load mix and attachment changesCapacity placard + load register
Aisle & floor classState geometry and floor assumptions in selectionMaintain aisle clearances and floor conditionLayout drawing + SAT measurement
Traffic / AMR coexistenceDefine truck behaviors and exclusion needsOwn FMS rules, scanner fields and charging logicCoexistence test script
Service & recoveryDocument diagnostics access and spare classesProvide permits, operators and site logisticsUptime Plan event log
Test and commissioning path

From factory checks to live-aisle acceptance

FAT proves the truck against agreed loads and safety inputs. SAT proves the same package inside the site aisle envelope, including outdoor transitions and any traffic-system interfaces that affect release into a wave.

  1. Input lock — load unit, aisle width, floor class and peak factor frozen or explicitly ranged.
  2. FAT scenarios — residual capacity, steer modes, brakes and safety devices exercised on named loads.
  3. Site prepare — aisle marks, charger access, fallback truck and go/no-go authority assigned.
  4. SAT scenarios — normal, peak and recovery runs with open deviations kept visible.
  5. Handover pack — diagnostics, spares, training and Uptime Plan clocks complete the release.
Service coverage

Application, integration and documentation support by project scope

Application desk

Load center, aisle geometry and duty-cycle reviews before quotation language hardens into false precision.

Integration support

Traffic rules, charger rooms and WMS/WCS tasking boundaries mapped when they affect truck release.

Documentation pack

FAT/SAT method statements, spare classes and recovery ownership packaged for maintenance and EHS reviewers.

Planning-range credentials (founded 1988, 38 years of industrial-truck application focus, 1,000+ people, 62 markets served by project scope, 2,500+ configured SKU options) are generated-range values from brand configuration—not independently verified public certifications. Performance remains tied to rated load with load center, aisle width, duty cycle and the FAT/SAT method agreed for the site.

What Combilift will not claim without site data

  • Pick rate or order lines per hour without SKU velocity, buffer occupancy and exception ownership
  • Residual capacity after attachments that were never measured in FAT
  • System availability percentages that mix planned maintenance with equipment faults
Acceptance evidence

Connect Combilift culture claims to documents and tests

Design Rate

Peak moves tied to SKU mix and aisle conflict assumptions.

Service path →
Service Response

Escalation clock and spare ownership before release.

Contact desk →